Areas

Which areas of the country do you cover?

We operate nationwide. 

Piling Work

How long will the piling work take?

Typically, foundations and a modest domestic extension can be completed within 1 week. Obviously larger projects will take longer and are assessed individually.

Do you do the excavations?

No we do not usually carry out the excavations.

What size trenches need to be excavated?

The excavation requirements will be stated on your quotation, however, generally 650mm deep x 450mm.

Is a site visit required?

A quotation can usually be produced without a site visit. However, a free site visit can be requested.

Do you arrange for pile calculations and design for submission to the local authority?

Yes, we provide a design service which will be itemised separately on your quotation, we will also forward these on and liaise with the relevant authorities.

Do you arrange for visits by the building inspector?

We will arrange visits by the relevant authorities prior to any concrete being placed.

 

 

Do you mark out the piles?

The piles are to be marked out by others, we will provide the pile layout, however this is the responsibility of the ground works contractor/building contractor who will be working from the architects drawings.

Do you need any water or electric?

No, we are self-sufficient.

How long is it before you can start the job?

Typically we work on 2 – 3 lead in period from receipt of order. This could potentially be reduced dependent upon size of project and our current workload.

Does your quote include VAT?

Our quotations do not include the VAT.